PROSEDUR PEMASANGAN BARU ALIRAN LISTRIK PADA PT. PLN (PERSERO) RANTING MARIANA
DOI:
https://doi.org/10.31851/jmwe.v8i3.4259Abstract
Some of these obstacles that lead to the length of the new installation of electricity, which PT PLN (Persero) Branch Mariana have to wait for shipment of materials from PT PLN (Persero) Branch for the new installation of electricity or for the manufacture of a new network overloading the network. But the amount of time and materials to be accepted pengirirman PT PLN (Persero) Branch Mariana determined by PT PLN (Persero) Branch, but PT PLN (Persero) branch does not know when material is required by PT PLN (Persero) Branch Mariana , this is because at the time of the Customer Service PT PLN (Persero) Branch Mariana fill out a new installation of electricity demand is made in just one duplicate and used as an archive PT PLN (Persero) Branch  Mariana so that no system of accounting information between     PT. PLN (Persero) Branch Mariana by PT PLN (Persero) Branch of material needs.
Â
Key words: Procedures, Accounting Information SystemsDownloads
Published
Issue
Section
License
The copyright of the received article shall be assigned to the publisher of the journal licensed under a Creative Commons Attribution-NonCommercial 4.0 International License in line with the license, authors and any users (readers and other researchers) are allowed to share and adapt the material only for non-commercial purposes. In addition, the material must be given appropriate credit, provided with a link to the license, and indicated if changes were made. If authors remix, transform or build upon the material, authors must distribute their contributions under the same license as the original.