(1)
Analisis Risiko Manajemen Material Dominan Penyebab Keterlambatan Waktu Dan Potensi Over Biaya Pada Proyek Oki Expansion Civil Work Phase 3. def 2026, 11 (1), 29-37. https://doi.org/10.31851/deformasi.v11i1.19984.