load forecasting, cluster data, ARIMAAbstract
The forecast load requirements for electrical energy are an important fist step in planning and developing electricity supply at any time sufficiently, well dan continously. Therefore we need a load forecasting method that is accurate and easy to implement based on available data on the Autoregrsive Integrated Moving Average (ARIMA) method. So the advantages in this ARIMA Method are good for short-term forecasting, flexible and can represent a wide range of time series characters that occur in the short term, there are formal procedures in testing the suitability of the model and forecast interval and predictions have followed the model. Period of data in school by clustering the monthly data, from the results of cluster clustering forecasting the burden of each monthly period in the future can be done
Abstrak-- Prakiraan kebutuhan beban energi listrik merupakan langkah mula yang penting dalam perencanaan dan pengembangan penyediaan tenaga listrik setiap saat secara cukup, baik dan terus menerus. Oleh karena itu diperlukan suatu metode peramalan beban yang akurat dan mudah di implementasikan berdasarkan ketersediaan data yang ada pada metode Autoregrsive Integrated Moving Average (ARIMA). Maka keunggulan dalam Metode ARIMA ini baik untuk peramalan jangka pendek, fleksibel dan dapat mewakili rentang yang lebar dari karakter deret waktu yang terjadi dalam jangka pendek, terdapat prosedur yang formal dalam pengujian kesesuaian model dan interval ramalan dan prediksi sudah mengikuti modelnya. Periode data di kelolah dengan cara mengcluster data perbulan nya, dari hasil pengelompokkan atau cluster peramalan beban setiap periode bulanan kedepannya dapat dilakukan.
References
A. S. Pabla, sistem distribusi daya listrik, jakarta: Erlangga, 1991.
E. Yuniarti, Sistem Distribusi Tenaga Listrik, palembang: tikah press, 2011.
H. Wibowo, “Peramalan beban listrik jangka pendek terklasifikasi berbasis metode autoregressive integrated moving average,†Electrans, pp. 1-8, September 2012.
A. Heru, “Aplikasi jaringan syaraf tiruan untuk peramalan beban tenaga listrik jangka panjang pada sistem kelistrikan di Indonesia,†Teknologi, pp. 211-217, 2005.
J. Perdana, “Prakiraan bebean puncak jangka panjang pada sistem kelistrikan Indonesia menggunakan algoritma adatiptive neuro-fuzzy inference system,†Teknik, pp. 64-69, 2012.
K. Ana, “Peramalan beban puncak pemakaian listrik di area Semarang dengan Metode Hybrid ARIMA-ANAFIS,†Gausian, pp. 515-723, 2015.
A. Affandy, “Prakiraan daya beban listrik yang tersambung pada Gardu Induk Sengkaling 2012-2021 menggunakan metode time series dengan model dekomposisisi,†2012.
Downloads
Published
How to Cite
Issue
Section
License
Jurnal Ampere is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.