“Pengendalian Waktu Proyek Konstruksi Gedung Kantor Pengadilan Tinggi Palembang Dengan Metode PDM”. Jurnal Deformasi 11, no. 1 (June 30, 2026): 120–130. Accessed October 24, 2026. https://jurnal.univpgri-palembang.ac.id/index.php/deformasi/article/view/21436.